Who We Are Catalog Geodomes Laminated Beams Video Virtual Tours News Showcase Build Teams Contact Us
 

Brewton, Alabama

Appleton Assembly of God
Brewton, Alabama 46426
80' Hexagon, 14' Sidewall
Assembled April, 1997

UCS Projects in Alabama

Pictures
Hoisting of the Arches
A pair of cranes are used to erect each of the six laminated arches into position.

Laminated Arch Assembly 
Assembling the laminated arches which form the superstructure for the hexagon shell.

Aerial Shot after Arch Assembly
Looking down on the laminated arch superstructure prior to the assembly of the walls and roof panels.

Ground Shot after Arch Assembly
A second look at the laminated arch superstructure from the ground.

Construction of the Walls
The UCS crew assembles the walls on the ground before hoisting them into place.

Sidewall Assembly
This shot shows the sidewalls of the hexagon before the roof panels are placed.

Preparing for Roof Panel Assembly
After placing the walls, the UCS crew prepares to assemble the roof deck.

Completed Shell
The hexagon shell, after the walls and roof panels have been placed.

Interior View of Hexagon Shell
A shot of the interior of the UCS shell after assembly is complete.

Finished Exterior
A finished outside shot of Appleton Assembly of God.

 

 

Tips for Building Links Downloads Home

 

©2004 United Church Structures • (800) 854-0977 • PO Box 608 • Davison, MI 48423

Site by Mustard Seed Studio, Inc.™