Who We Are Catalog Geodomes Laminated Beams Video Virtual Tours News Showcase Build Teams Contact Us
 

Brea, California

Carbon Canyon Church
Brea, California 92823
90' Dome, 12' Sidewall
Assembled January, 1992
http://www.carboncanyon.com

UCS Projects in California

Pictures
Sidewall Preparation
After construction, a crane will lift a sidewall and position it.

Assembly of the Sidewall
A look at the construction process as the first two sidewalls on the dome are set.

Exterior Shell of Dome Complex
Carbon Canyon's dome was combined with a series of connecting wings.  This shot shows the whole complex during their assembly.  

Cupola Shot 
A close-up of the cupola during the construction process on the dome. 

Construction of a Wing Addition
This shot is a close-up of one of the wings that is attached to the dome complex, (which is visible in the background.)

Dome Interior During Construction
A shot of the interior of a dome using a wide-angle lens.

 

Tips for Building Links Downloads Home

 

©2004 United Church Structures • (800) 854-0977 • PO Box 608 • Davison, MI 48423

Site by Mustard Seed Studio, Inc.™