|
|
|
|
 |
 |
 |
Wadley,
Georgia
| Redeemed
Church of our Lord Jesus Christ |
Wadley,
Georgia, 31082
95' Octagon, 12' Sidewall
Assembled December, 1993
UCS
Projects in Georgia
|
| Pictures |
Erection
of Beams
The first step in the octagon assembly process is the erection and assembly
of the laminated beams.
Connecting
the Beams to the Hub
At the apex of an octagon structure
is a hub to which the beams are connected.
Setting
of Purlins
After erection of the beams, the
purlins, or inter-beam support members
are placed.
|
|
|
|
 |
|