Attaching
Beams
UCS uses man-lifts
to assist in attaching beams to the steel
connecting hubs.
Setting
Wall Panels
After the UCS
crew assembled the supporting superstructure,
the went ahead and assembled the walls
and roof deck.
Setting
the Cupola Beams
The UCS crew
uses the crane to lift the cupola beams
into place on top of the structure. Notice
the basement foundation below the church
Placing
Roof Panels
Our crew uses
the crane to hoist the roof panels into
place. They are then secured to the
beam superstructure.
Roughed-in
Shell
A photo of the
shell after assembly by the UCS crew
Roughed-in
Shell 2
A second photo
of the roughed in shell, with the church's
old structure in the background
View
from Roof
A look down
from the roof of the dome. In the
background is the pond near the church
Roughed-in
Shell 3
A third shot
of the roughed in shell, with the basement
foundation clearly visible.