Assembly
of Beams
(80' dome) After assembly of the beams, the dome is prepared for the setting
of roof panels.
Setting
Roof Panels
(80'
dome) The roof deck for a geodesic
dome is composed of a series of interlocking
structural insulated panels.
Completed
Exterior
(80'
dome) After New Life's 80' dome was
complete, it was used as their brand new
worship center.
Cupola
Shot
(80' dome) The height of the dome allows for a light bar to be
hung in the peak of the building.
Finished
Sanctuary Interior
(80'
dome) The congregation at New Life
Christian chose to use chairs to make their
worship arrangement functional.
New
Complex Rendering
This
photo is of an architectural rendering
of the new complex with the second 120'
dome.
Basement
Foundation
(120'
dome) New Life Christian Center's
120' dome was placed on a basement which
housed classrooms for their Christian School.
Setting
Roof Panels
(120'
dome) The UCS crew used a crane from
a grade level to lift the roof panels to
the top of the dome structure
Dome
Interior during Construction
(120'
dome) A second level perimeter was
placed inside the dome structure to house
a children's play center and a teen area.
Two
Dome Complex
This
shot shows both domes and the connecting
structure between them.
Gymnasium
Closeup
(120'
dome) This shot shows a closeup of
the 120' dome near the end of the construction
process.
Complete
Complex
A
sunset shot taken of both domes from the
road in front of the church
|