Who We Are Catalog Geodomes Laminated Beams Video Virtual Tours News Showcase Build Teams Contact Us
 

East Warsaw, Indiana

Trinity Faith Tabernacle
East Warsaw, Indiana, 46580
72' Octagon, 12' Sidewall
Assembled May, 1996

UCS Projects in Indiana

Pictures
Panel Drop-off
A delivery truck arrives to drop off the SIPS panels needed for the roof deck.

Wall Construction
The UCS crew assembles a sidewall for the octagon, as specified in the architectural prints.  

Arches and Purlins
After assembly of the arches and purlins, the structure is ready for the assembly of the sidewalls and roof deck.

Hub and Arches 
The steel connecting hub is the element which lies at the apex of the structure.  In addition, the arches are wrapped in a protective covering, to hedge against damage during the construction process. 

Basement Foundation
Many congregations choose to place their structures on a walkout basement.  This was the case with Trinity Faith Tabernacle.

Interior Shot
Like many UCS structures, the rich laminated arches are an accentuating element within the interior of one of our octagons.  

 

Tips for Building Links Downloads Home

 

©2004 United Church Structures • (800) 854-0977 • PO Box 608 • Davison, MI 48423

Site by Mustard Seed Studio, Inc.™