|
|
|
|
 |
 |
 |
Ann
Arbor, Michigan
| Labor
of Love Church of God in Christ |
Ann
Arbor, Michigan, 48107
80' Dome, 12' Sidewall
Assembled in December, 1996
UCS
Projects in Michigan
|
| Pictures |
|
Assembled
Shell
After assembly,
the UCS shell is ready for finishing by
the general contractor.
Finished
Exterior
A photo of the
exterior of Labor of Love taken in the
spring of 2002.
|
|
|
|
 |
|