Who We Are Catalog Geodomes Laminated Beams Video Virtual Tours News Showcase Build Teams Contact Us
 

Flint, Michigan

Morning Star Missionary Baptist Church
Flint, Michigan, 48505 
110' Octagon, 14' Sidewall
Assembled in July, 2002

UCS Projects in Michigan

Pictures
Building an I-Joist Panel
To speed up the assembly process, the UCS crew makes panels out of the I-Joists while they are still on the ground.

Shell during Assembly of I-Joists
A look at the shell while the UCS crew placed I-Joists.

Lowering a Roof Panel in Place
The UCS crew uses a crane to lower the panelized I-Joist system in place.

Interior Roof Deck after Sheeting
Once the sheeting is in place, the roof deck is ready for electrical and mechanical installation.

Exterior Shell 
A look at the exterior of the shell once the sheeting is in place.  

Setting Bricks and Roof Trusses  
After the UCS crew was finished, the masons and general contractors went to work assembling the wings to the building. 

 

Tips for Building Links Downloads Home

 

©2004 United Church Structures • (800) 854-0977 • PO Box 608 • Davison, MI 48423

Site by Mustard Seed Studio, Inc.™