Who We Are Catalog Geodomes Laminated Beams Video Virtual Tours News Showcase Build Teams Contact Us
 

Mt. Morris, Michigan

Korean Presbyterian Church
Mt. Morris, Michigan, 48458 
75' Dome, 12' Sidewall 
Assembled in July, 1995

UCS Projects in Michigan

Pictures

Assembling the Cupola
The final step in the dome assembly process is to assemble the cupola on top of the structure.

Interior During Construction
When the UCS crew is complete, the general contractor goes to work finishing the structure.

Finished Interior
A view of the pulpit at Korean Presbyterian in Mt. Morris. 

Finished Exterior
Korean Presbyterian was finished with a brick fascia and a white transition belt.

Finished Exterior 2
Korean Presbyterian is accented with a gable extension that houses the foyer to the church

 

Tips for Building Links Downloads Home

 

©2004 United Church Structures • (800) 854-0977 • PO Box 608 • Davison, MI 48423

Site by Mustard Seed Studio, Inc.™