|
Interior
During Drywall Phase
After the UCS
crew is finished on-site, individual
contractors come in and take care of
finishing details like the application
and preparation of drywall.
Cupola
Interior after Assembly
The
beams surrounding the cupola are usually
left covered until much of the finish work
inside the sanctuary is complete.
Finished
Structure
The finished
structure at Cambridge included two attached
wings which included educational areas.
|