|
Virtual
Tour of the Sanctuary
A virtual tour of the sanctuary of
this project is available
Setting
Sidewalls
Once the arches
and sidewalls are in place, the UCS crew
goes to work preparing to set roof panels.
Rectangle
Exterior
UCS
uses a crane to lift the SIPS roof panels
into place where they are attached to the
arches.
Completed
Shell
This is a look at the shell from the
top of a UCS lift.
Finished
Exterior
A look at the finished exterior of
the 70'x88' rectangle.
|