Preparing
for Shingling
After assembly
is complete, there is usually a week
or two delay before the UCS shingling
crew arrives to put the roof on the building.
Panels
Arriving on Site
Panels
are usually placed close to the slab, and
are covered with a plastic wrap.
Finished
Exterior
This is a look at the finished exterior of Greater St. John Missionary
Baptist Church
Finished
Exterior 2
A look at the backside of the dome of Greater St. John Missionary Baptist
Church.
|