Setting
Sidewalls
The sidewalls
at Holy Temple House of Deliverance included
a set of gables which were constructed
on-site.
Sidewall
Assembly
When
the arches are in place, the sidewall is
attached to them.
Construction
Equipment<
The UCS crew
uses a series of machinery, including
lifts, cranes and fork trucks to assist
in the assembly process.
Finished
Shell
The
height of the sidewall allows for the addition
of elements like balconies.
Finished
Shell 2
After assembly by the UCS crew, the
other members of the construction team
come on-site to install elements like plumbing,
electrical, and HVAC.
|