Finished
Shell
The 24' sidewall on the
shell makes this shell look massive in comparison
to other geodesic dome shells.
Placing
of Beams
The beams are often assembled in sections on the
ground, before being hoisted into place.
Attaching
Beams
When the beams are
placed, the UCS crew will use lifts to attach them
to the connectors within the roof skeleton.
Placing
Beams 2
With the
height of the sidewall, the lifts became critical
elements to assist with placing the beams.
Finished
Shell 2
A look from
the ground at the assembled shell of Abundant Life
Fellowship.
Finished
Shell 3
A third
look at the finished shell at Abundant Life
Fellowship.
Finished
Exterior
This exterior shot of Abundant Life Fellowship was
taken during the dedication which was attended by
Shawn Barrett and Ann Ferguson.
Finished
Interior
This finished interior shot was taken during
Abundant Life's dedication service.
|