Home > Past UCS Projects > UCS Projects in Ohio 
    > Cambridge

Cambridge, Ohio

Harvest Christian Fellowship
Cambridge, Ohio, 43725
80' Dome, 13' Sidewall
Assembled in May, 1998

UCS Projects in Ohio

Pictures

Interior During Drywall Phase
After the UCS crew is finished on-site, individual contractors come in and take care of finishing details like the application and preparation of drywall. 

Cupola Interior after Assembly
The beams surrounding the cupola are usually left covered until much of the finish work inside the sanctuary is complete.     

Finished Structure
The finished structure at Cambridge included two attached wings which included educational areas. 

©2003 United Church Structures  2046 S. State Road Ste. B, Davison, MI 48423    Phone: (800) 854 0977    Fax: (810) 653-1865

Search: