|
Home
> Past UCS Projects >
UCS Projects in Ohio
> Cambridge
Cambridge,
Ohio
| Harvest
Christian Fellowship |
Cambridge,
Ohio, 43725
80' Dome, 13' Sidewall
Assembled in May, 1998
UCS
Projects in Ohio
|
| Pictures |
|
Interior
During Drywall Phase
After the UCS crew is
finished on-site, individual contractors come in
and take care of finishing details like the
application and preparation of drywall.
Cupola
Interior after Assembly
The beams
surrounding the cupola are usually left covered
until much of the finish work inside the
sanctuary is complete.
Finished
Structure
The finished structure
at Cambridge included two attached wings which
included educational areas.
|

©2003
United Church Structures 2046 S. State Road
Ste. B, Davison, MI 48423 Phone: (800)
854 0977 Fax: (810) 653-1865
|